Nicollet Island Pump Station

Construction of a small pump station to improve tap water circulation in the two water mains that serve Nicollet Island from the Saint Anthony side of the Mississippi River.
 
Project location

Project status

Completed.

Project details

Project type:
Construction of a small pump station to improve tap water circulation in the two water mains that serve Nicollet Island from the Saint Anthony side of the Mississippi River

Project benefits:
Installing two small pumps inside a pump house, the size of a one-car garage, will provide enough water circulation to alleviate concerns the water mains will freeze during the winter months. The exterior of the pump house will consist of granite pavers once used as a surface for city streets providing aesthetic value while taking advantage of an opportunity to re-use salvaged materials.

Project location:
The proposed pump house will be built into an existing slope adjacent to the First Avenue Bridge and a small parking lot owned by DeLaSalle High School.

Construction start date:
June, 2017

Duration of construction:
6 – 9 Months

Traffic impact:
Single lane closure of East Island Avenue with full closure limited to 1 to 2 weeks in the area of the Hennepin Avenue and 1st Avenue bridges.

Attachments:
Proposed Pump Station Aerial Rendering
Proposed Pump Station Overview Rendering

 
 

Request accessible format

If you need help with this information, please email 311, or call 311 or 612-673-3000.

Please tell us what format you need. It will help us if you say what assistive technology you use.

Contact us

 

Public Works

 
 

Phone

612-673-2352

 
 

Address

City Hall
350 Fifth St. S.
Room 203
Minneapolis, MN 55415