Chicago Avenue Sidewalk Gap

In 2018, the Minneapolis Public Works Department built a sidewalk on the east side of Chicago Avenue from 44th Street East to 46th Street East.

Project status & overview

The Project was completed in 2019.

Overview

In 2018, the Minneapolis Public Works Department planned to build a sidewalk on the east side of Chicago Avenue from 44th Street East to 46th Street East. This segment of Chicago Avenue is identified as a sidewalk gap in the Minneapolis Pedestrian Master Plan. The project added a sidewalk on the east side of the roadway without impacting existing trees or street lighting, and upgraded curbs and curb ramps.

What are sidewalk gaps?

Sidewalk gaps are sections of roadway that have no sidewalk on either side or are missing sidewalk on one side of the street. Sidewalk gaps often exist in places with slope issues, a lack of right of way outside of existing curbs, or in places that haven’t been required to have sidewalks in the past, such as in industrial areas or abutting rail lines. In grassy areas, they are often identifiable by a dirt path indicating where people walk.

The sidewalk network is a vital component of the transportation network. A connected and continuous sidewalk network better accommodates the needs of all pedestrians, including children, seniors, and people with disabilities.

   

 

Request accessible format

If you need help with this information, please email 311, or call 311 or 612-673-3000.

Please tell us what format you need. It will help us if you say what assistive technology you use.

Contact us

 

Minneapolis 311

 
 

Office hours

7 a.m. – 7 p.m.
Monday – Friday