Application
You must complete this application at least two (2) weeks before the installation of any gasoline or flammable liquid storage tanks, and before any piping from flammable liquid storage tanks is altered.
This application is for tank installation only. Tank removal and abandonment permits are issued by the Minneapolis Health Department. A separate annual Hazardous Materials Permit is required for use, storage, and handling.