Mechanical Permits
Effective Monday, March 1, 2021, all mechanical permits submitted to the City of Minneapolis must use the new, updated mechanical permit application form (to be posted online on March 1, 2021). Please clear your web browser(s) cache to remove any cookies tied to previous versions of this permit application. Any older, previous versions will be rejected and a new version will be requested. The updated mechanical permit application form will reflect changes to our mechanical permit review process including information necessary for digital plan review in our Project Dox system. |
Effective Monday, August 10, 2020, the City of Minneapolis will no longer accept, process, issue or inspect new permit submittals for radon mitigation systems in the City of Minneapolis.
Due to the resolution of recent legal challenges to State of Minnesota Department of Health requirements, radon mitigation permits must now be requested from the State of Minnesota Health Department.
Any open permits issued from the City of Minneapolis prior to August 10, 2020 will need to obtain final inspections from city inspection staff.
For all new residential construction and for additions to residential construction where a radon mitigation system is currently installed, these radon systems will continue to be reviewed and inspected as part of the overall building permit issued for the project – no additional mechanical permit is required.
Visit the Minnesota Department of Health websites for more information on Radon in Homes, Radon Laws, Rules and Standards, and Licensing for Radon Professionals.
Mechanical Application Form Mechanical work includes: Heating, Air-Conditioning, Ventilation, Refrigeration, Gas Piping
EXISTING RESIDENTIAL (1 & 2 DWELLING)
There are three levels of work that can be done, each with a set fee associated with the work being proposed. Refer to the application for a description of the work covered by each level and complete section 1 on page 2 of the application form. Application can be made by mail., fax, in-person, or online.
Existing Residential (1&2 Dwelling) Fee Schedule
NEW RESIDENTIAL CONSTRUCTION (1 & 2 DWELLING)
If the mechanical work being performed is part of a larger project that increases the square footage of the existing dwelling the applicant must complete section 2 on page 2 of the application form. Plans are required. Applications can be made by mail, fax, or in-person.
New Residential Construction (1 & 2 Dwelling) Fee Schedule
Residential Mechanical Inspections Process
NEW OR EXISTING COMMERCIAL OR MULTI-FAMILY
Complete section 3 on page 2 on the application form for all commercial, multi-family (3 or more dwelling units). Plans may be required. Applications can be made by mail, fax, or in-person.
New and Existing Commercial or Multi-family Fee Schedule
TEMPORARY HEAT
Due to concerns over potential public safety issues we are implementing new rules for temporary heat sources. Permits for temporary heat sources are applied for with a New or Existing Commercial of Multi-family Application Form. As of November 10, 2014 temporary heat sources will require a separate permit and shall not be included with other mechanical work being performed.
Temporary Heat Requirements Document
Examples of mechanical work that require a permit
- Install a heating appliance such as a furnace, boiler, or space heater.
- Install duct work, radiant heat, in-floor heat, or baseboard heat.
- Install gas piping for environmental heating appliances (work that includes the installation of gas appliances, other than those providing environmental heat, such as water heaters, fireplaces, ranges, ovens, or laundry dryers must be applied for with a plumbing permit (BTPA) application).
- Install air-conditioning
- Install refrigeration equipment
- Install high pressure steam or ammonia systems
- Install radon mitigation systems
This list is not intended as a complete list of work that requires a mechanical permit. For more information you may consult the Minnesota State Building Code Chapter 1346 or speak with a plan examiner to determine if the work you are proposing requires a permit. For a list of mechanical work that does not require a permit please refer to (“When Do I NOT Need A Permit”)
Additional Information
Most mechanical work is required to be done by a licensed professional Find a Licensed Contractor. Licensing includes contractor licenses and certificate of competency.
A homeowner that occupies a single-family dwelling may qualify for an exemption to the licensing requirement. If you meet the requirements of Minneapolis Code of Ordinances Section 89.30 you may be allowed to perform mechanical work as described in the ordinance.
Last updated Feb 16, 2021