Concrete Streets Rehabilitation

The purpose of the Concrete Streets Rehabilitation Program is to extend the life of some concrete city streets. This program is similar to the Asphalt Pavement Resurfacing Program with the objective to improve and maintain the roadway infrastructure. The goal is to target concrete streets that with proper concrete repair will extend the street’s life to improve ride quality and support neighborhood livability.

Program Background

An Explanation of Concrete Rehabilitation

Concrete streets generally deteriorate over time as water and salt enter joints and cracks. Poor drainage, underlying soil condition, and higher traffic volumes can accelerate the deterioration. The repair of concrete primarily consists of saw cutting, removing and replacing concrete joints that have deteriorated and other pavement distresses. Other repair techniques include removal and replacement of concrete panels if it is determined the condition of the concrete does not warrant salvaging the panel pavement. Other improvements within the project limits include upgrades to select pedestrian ramps, replacement of select curb and gutter, and a diamond grind resurfacing of the street pavement. For this type of work, it is anticipated that less than 25% of the pavement will be replaced. Concurrent with the street work, utility improvements will be completed associated with gas, water and sewer.

Project Areas

Waite Park (2019-2020)

Concrete street rehabilitation will be continued in the Waite Park neighborhood in 2019 and 2020. These concrete streets were constructed in 1967 and 1968 and are good candidates for concrete repair and resurfacing.

 2019 Waite Park Map

Project Status

Project Status: Construction

Schedule

The City of Minneapolis’ concrete rehab project will start tentatively on August 14, 2019.  The City will start the project in the SE portion of the project.  It is anticipated that a portion of the project will be completed in 2019, and the remainder will be completed in 2020.

Before the construction activities start, the street will be marked out for repair. As the construction date gets closer, advance notice signage will be placed on the street.  Notices will be delivered to residents whose block will start construction in advance of the work.  Additionally, if a driveway will be directly impacted, the contractor will notify you in advance of the work. They will leave a flyer at your front door, so please be sure to check this area regularly if work is taking place on your block. The advance notice for driveway work will be given the day before driveway impacts will begin.

Additionally, CenterPoint Energy will perform utility work either before or concurrent with street reconstruction.  They are upgrading gas mains and services. For more information on CenterPoint Energy's work, please visit CenterPoint Energy's Waite Park project page.

Traffic Impact

When the City’s contractor is actively working on a block, they will close the block to through traffic. If there are no driveways on a block, they may keep the block closed to traffic until all of the work is complete on the block. If your block is being worked on, please consider parking in your alley (if present) or on an adjacent street. Please give yourself extra time and be prepared to go in an alternate direction than intended. If your driveway is impacted, please be prepared to not use the driveway for a few days.  The contractor will work to minimize inconveniences, but there will be equipment and people that will need to work on the street to make these improvements. 

Additionally, due to the nature of concrete, it can take up to several days to gain the strength that it needs to allow traffic to drive on it.  This means that there will be times when there are lane closures and no one will be actively working on the street. If traffic drives on new concrete too soon, it could lead to cracking of the new pavement.  This could require the work activities to be re-done and additional inconveniences.  Emergency vehicles always have priority through our construction projects, and they will not hesitate to do what they need to do to respond to an emergency.

If you have special mobility concerns, such as handicapped parking or Metro Mobility pickups and drop-offs, please reach out to the project team so we can work with you to maintain your transportation access.

Updates

August 5, 2020

Work in the past week

  • Tuesday, August 4, 2020: Concrete pour Polk St NE between 36th Ave NE and 37th Ave NE. Righthand side.
  • Wednesday, August 5, 2020: Concrete removal on Tyler St NE Righthand side between 37th Ave NE to dead end. Started sawing concrete on Hayes St NE between 37th Ave NE and Hollywood St NE; also sawing on Hollywood between Johnson St and Cleveland St NE
  • Thursday, August 6, 2020: Concrete removal on Hayes St NE and Hollywood Ave NE
  • Friday, August 7, 2020: Concrete pour Tyler St. NE , Hayes St  NE and Hollywood Ave NE

July 29, 2020

Work in the past week

  • Restoration with top soil, seed, and blankets is in progress throughout project.
  • Monday, July 27, 2020: Finished pouring full depth repairs on Tyler St NE; starting milling particals on Polk St NE and Tyler Ave NE.
  • Tuesday, July 28, 2020: Finished pouring ped ramps Polk St NE rand Tyler St NE both on 33rd Ave NE; started jackhammering particals Tyler St NE and Polk St NE
  • Wednesday, July 29, 2020: Started pouring partials on Tyler St NE; jackhammering partials on Polk St NE
  • Thursday, July 30, 2020; Start milling partials on Polk St NE  between 34th Ave NE and 35t h.c Ave NE  jackhammering to follow; start saw cutting o the Polk St. NE between 36th Ave NE and 37th Ave NE and Tyler St NE to follow.
  • Friday, July 31, 2020: Start pouring partials on Polk St NE between 32nd Ave and 35th Ave NE

Work anticipated for next week

  • Monday, August 3, 2020: Start removals on Polk Ave NE between 36th Ave NE and 37th Ave N Tyler St NE to follow.
     

July 21, 2020

Work in the past week

  • July 21, 2020: No work (rain out)
  • July 22, 2020: Concrete pouring will continue on Polk St. NE between 34th Ave NE and 35th Ave NE northbound; removals will continue on Tyler St NE southbound between 35th Ave NE to 32nd Ave NE
  • July 23 and 24, 2020: Concrete will be poured on Tyler St. NE southbound between 35th Ave and 32nd Ave NE
  • July 27, 2020: Sawing and Sealing will continue on 36th Ave NE and continuing on with streets in the area.

July 15, 2020

Work in the past week

  • July 13, 2020: Concrete removals on Tyler St NE started
  • July 14, 2020: Concrete canceled due to rain. Diamond grinding continued on Buchanan St NE and Lincoln St NE
  • July 15, 2020: Concrete poured on Tyler St NE Southbound between 35th Ave NE to 33nd Ave NE
  • July 16, 2020: Concrete removals on Polk St NE Southbound between 32nd Ave NE to 35th Ave NE
  • July 15, 2020: Concrete sawing and sealing from Arthur St NE  to Ulysses St NE from 33rd Ave NE through 29th Ave NE this will be on going for the next 2 weeks
  • July 16, 2020: Diamond grinding from Johnson St NE to Cleveland St NE on 32nd Ave NE also Johnson St NE to  Cleveland St NE
  • July 16, 2020: Concrete pour continues on Tyler St NE southbound and continuing to Polk St NE
  • July 17, 2020: concrete pour on Polk St NE and concrete removals on Tyler St. NE northbound side.

July 8, 2020

Diamond grinding was completed on 36th Ave from Polk St to Johnson St on Tuesday, July 7, 2020.

Diamond grinding started on Taylor St between 36th Ave and 35th Ave on Wednesday, July 8, 2020. Grinding will proceed to Fillmore St, Pierce St, Buchanan St and Lincoln St. between 36th Ave to 35th Ave.

Sawing will start 35th Ave and Tyler St on Thursday, July 9, 2020, and proceed to 32nd Ave on Monday, July 13, 2020. 

Removals will start at Tyler St from 35nd Ave to 32nd Ave on Tuesday, July 14, 2020. Concrete will be poured on Tyler St and 35th Ave on Monday, July 13, 2020. Once diamond grinding is complete on Lincoln St, grinding will start on 32nd Ave and 31st Ave between Johnson St and Cleveland St.

July 1, 2020

Diamond grinding started on Wednesday, July 1, 2020, starting on 36th Ave N between Polk St.NE and Johnson St NE. Once completed they will move to Lincoln St, Buchanan St, Pierce St, Fillmore St and Taylor St between 36th Ave N and 35th Ave NE.

Sawing will start on Thursday, July 2, 2020 on Polk St N between 36th Ave and 32nd Ave N.

Removals will start on Monday, July 13, 2020 on Polk St N between 36th Ave and 32nd Ave N.

Concrete pouring will start on Tuesday, July 14, 2020 on Polk St between 36th Ave and 32nd Ave N.

July 26, 2020

  • June 22, 2020 -  Milling partials on 36th Ave NE between Johnson St. and Polk St.
  • June 23, 2020 - June 24, 2020 - Jackhammering partials on 36th Ave NE between Johnson St. and Polk St.
  • June 25, 2020 - Pouring partials on 36th Ave NE between Johnson St and Polk St.
  • June 26, 2020 - General clean-up and restoration

June 29, 2020

Starting diamond grinding on 36th Ave N between Johnson St and Polk St and between 35th Ave NE and 36th Ave NE on the following streets:

  • Lincoln St
  • Buchanan St
  • Pierce St
  • Fillmore St
  • Taylor St

Following the above mentioned areas grinding will proceed on:

  • 31st Ave NE and 32nd Ave NE between Ulysses St and Johnson St.
  • 32nd Ave NE from Ulysses St to Garfield St
  • 31st Ave NE from Ulysses St to Hayes St NE

There will be no work on Friday, July 3, 2020.

June 17, 2020

We have completed the following work:

  • Continued to pour concrete on 36th Ave from Polk St to Johnson St northside

  • Poured concrete on 35th Ave and Tyler St. Replacing bituminous patch with concrete SW Quad
  • Other miscellaneous curb has been poured along with ped ramps on 36th Ave
  • Top soil restoration throughout project

On Thursday, June 18,  2020 we'll finish concrete pouring on 36th Ave, miscellaneous parking panels and ped ramps northside.

On Friday, June 19, 2020, we plan to do general project cleanup.

On Monday, June 22, 2020 we'll start milling particals depth on 36th Ave from Polk St. To Johnson St. and prep to pour on Tuesday, June 23, 2020.

June 9, 2020

Concrete was poured on 31st Ave and 32nd Ave between Johnson St and Ulysses St on the north side on June 9, 2020.

We started removals on June 8, 2020 on the south side of 36th Ave from Polk St to Johnson St NE, and completed on June 9, 2020.

We are pouring concrete on 36th Ave NE at Polk St and moving towards Johnson NE. W are finishing pouring concrete on the north side of 31st and 32nd between Ulysses and Johnson St.

We will be sawing on Friday, June 12, 2020 on 36th Ave NE on the north side

On Monday, June 15, 2020 we'll begin particles milling between Johnson St NE and Hayes St on 31st Ave NE, and between Johnson St NE and Garfield St NE on 32nd Ave NE.

June 3, 2020

We will be pouring concrete and placing topsoil at these locations:

  • 31st Ave southside and 32nd Ave southside between Johnson St and Ulysses St
  • Particals will be poured at Lincoln St to Taylor St
  • Between 35th Ave and 36th Ave

Concrete removal will start on Monday, June 8, 2020 at 32nd Ave and 31st Ave northside between Johnson St and Ulysses St, and on 36th Ave from Johnson St to Polk St. southside.

May 20, 2020

Removals started May 18, 2020 on 35th Ave and Lincoln up to 36th St then proceeded to 35th St and Buchanan St NE up to 36th St. The next street removed will be Pierce St in between 35th St and 36th St NE. Removals started on May 19, 2020 at 35th Ave and Fillmore St NE to 36th Ave NE, next 35th Ave and Taylor St NE. The same sequence for removals was used to pour back the streets and this was done May 20 and 21, 2020. This will be the second half of the streets.

Pedestrian ramps were removed at the following intersections:

  • 36th Ave NE and Filmore St NE SW
  • 36th Ave NE and Lincoln St NE SE
  • 36th Ave NE and Buchanan ST NE SE
  • 36th Ave NE and Pierce ST NE SE
  • 36th Ave NE and Taylor St NE SE

These will be poured back on May 20 and 21, 2020.

May 13, 2020

Concrete pouring started on May 11, 2020 on 35th Ave and Lincoln up to 36th St then proceeded to 35th St and Buchanan St NE up to 36th St. The next street poured will be Pierce St in between 35th St and 36th St NE. Only one half of the streets are being poured which is the left lane. Removal of the pedestrian ramps started on May 13, 2020 on Filmore St and 36th Ave opposite corners.

May 7, 2020

Construction is scheduled to begin on May 11, 2020, on Lincoln Ave and 35th St of the project area.

April 29, 2020

The contractor Ti-Zack is looking on completing saw cutting on Monday, May 4, 2020 and tentatively start removals on Wednesday, May 6, 2020 on Taylor St NE and 36th Ave NE.

April 20, 2020 Update

2019 Public Meetings

Neighborhood Construction Meeting
6:30 p.m., August 8 2019
Waite Park Recreation Center
1810 34th Ave NE
Minneapolis, MN

Formal Public Hearing
10 a.m., April 9, 2019
Council Chambers, City Hall
350 South 5th Street, 3rd Floor

Pre-Assessment Public Meeting
April 4, 2019

Public Open House
February 27, 2019

Contact

Joe Homan, WSB, Engineer; [email protected] or 612-209-6269

Tracy Lindgren, Engineer; [email protected] or 612-290-5898

Waite Park (2017-2018)

Waite Park Concrete Streets Rehab Overview Map

Project Status

CIP Status Stage 5: Completed

Project Details

Project Type:
Concrete Street Rehabilitation

Project Location:
Waite Park neighborhood

Construction Start Date:
Utility work in Spring 2018
Reconstruction work scheduled to start in May 2018.

Traffic Impact:
Short term detours

2018 Public Meetings:

Pre-Public Meeting
6:30 p.m., Wednesday, May 9, 2018
Waite Park Recreation Center
1810 34th Avenue Northeast

Formal Public Hearing
10 a.m., Tuesday, May 15, 2018
Council Chambers, City Hall
350 South 5th Street, 3rd Floor

2017 Public Meetings:

Pre-Public Meeting
6:30 p.m., Wednesday, February 22, 2017
Waite Park Recreation Center
1810 34th Avenue Northeast

Formal Public Hearing
9:30 a.m., Tuesday, February 28th, 2017
Council Chambers, City Hall
350 South 5th Street, 3rd Floor

Project Maps

2017 Waite Park Staging Areas Map

2017 Project Area Map

2018 Project Area Map (Task Order #3)

Waite Park Project Phases Map

Updates

November 2, 2018 Update

October 26, 2018 Update

October 19, 2018 Update

October 12, 2018 Update

October 5, 2018 Update

Contacts

Nicole Schmidt, Project Information Contact, [email protected] or 612-430-2805

Brad Fisher, Project Representative, [email protected] or 612-759-7240

Petru Vizoli, Engineer, [email protected] or 612-673-2368

Penn-Oliver (2017)

Penn Oliver Ave S Concrete Rehab Webmap.png

Project Status

CIP Status Stage 5: Completed

Project Details

Project Type

Concrete Street Rehabilitation

Project Location
Penn/Oliver Ave S from West Lake of the Isles PKWY to Douglas Ave

Construction Dates
Anticipated start – Week of June 18th, 2017
End – Week of August 13th, 2017

Traffic Impact
Short term detours

The purpose of the Concrete Streets Rehabilitation Program is to extend the life of some concrete city streets. This program is similar to the Asphalt Pavement Resurfacing Program with the objective to improve and maintain the roadway infrastructure. The goal is to target concrete streets that with proper concrete repair will extend the street’s life to improve ride quality and support neighborhood livability.

Concrete streets generally deteriorate over time as water and salt enter joints and cracks. Poor drainage, underlying soil condition, and higher traffic volumes can accelerate the deterioration. The repair of concrete primarily consists of saw cutting, removing and replacing concrete joints that have deteriorated and other pavement distresses. Other repair techniques include removal and replacement of concrete panels if it is determined the condition of the concrete does not warrant salvaging the panel pavement. Other improvements within the project limits include upgrades to select pedestrian ramps, replacement of select curb and gutter, and a diamond grind resurfacing of the street pavement.

Scope

The proposed project is part of the Concrete Streets Rehabilitation Program. Penn-Oliver Ave S was constructed in 1970 and is a good candidate for concrete repair and resurfacing. Concurrent with the street work, utility improvements will be completed associated with gas, and sewer.

For More Information

See this video for a deeper look into what concrete rehabilitation involves.

See this FAQ Sheet on concrete rehabilitation for more information.

Public Meetings

Pre-Public Hearing Meeting
6:30 p.m., Tuesday, May 9, 2017
Kenwood Community Center
2101 W Franklin Ave, Minneapolis, MN 55405

Public Hearing
9:45 a.m., Tuesday, May 16, 2017
Council Chambers, City Hall
350 South 5th street, 3rd Floor

Project Contacts

Nicole Schmidt, Project Information Contact, [email protected] or 612-430-2805

Brad Fisher, Project Representative, [email protected] or 612-759-7240

Elisha Langat, Engineer, [email protected] or 612-673-5974

Penn-Oliver Email Updates
To sign up for updates or to access your subscriber preferences, please enter your contact information below.

Contact

Tracy Lindgren, Construction Engineer; [email protected] or 612-290-5898

 

Last updated Aug 10, 2020

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-263-6850.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

Public Works  ©1997-2020 City of Minneapolis, MN

CONNECT

311 call center

311 TTY relay service

City of Minneapolis Facebook City of Minneapolis Twitter City of Minneapolis YouTube ChaNNEL Minneapolis 311 Watch Minneapolis City Council TV City of Minneapolis LinkedIn

Minneapolis, City of Lakes logo