Water Main Cleaning and Lining
Of the 1060 miles of water main pipes in Minneapolis, 760 miles are constructed of unlined cast iron. Cast iron was the standard until the 1970’s and it was manufactured unlined. All pipes installed since the 1970’s are made of ductile iron that comes from the factory with a cement lining on the inside. With time, unlined cast iron mains build up mineral deposits that restrict the flow and can result in discolored water. Rusty water meets all regulatory requirements but is aesthetically displeasing.
This water main cleaning and lining project is to scrape the rust out of the pipes and install a potable water grade lining that keeps that will prevent new rust from forming. This will extend the life of the pipes as well as improve the water appearance and flow of water through the pipes.
Because the water main must be empty for the work, each building that taps into the water mains that are being worked on will be supplied with a temporary water line. The water in the temporary pipes will be sampled throughout the project to make sure that the water meets drinking water standards.
This work will not be assessed to the property.
The traffic impact for these projects is minimal. Learn more about project locations below.
2020 Water Main Cleaning and Lining
Construction dates
- Central Neighborhood: May 2020
- South Uptown: May 2020
- Linden Hills: May 2020
- Willard Hay: June 2020
- Grand Avenue: June 2020
- Penn Ave N: August 2020
Project limits
Cleaning and Mortar Lining | |
1. Central Neighborhood | Oakland Avenue South from Lake to 36th Street Park Avenue South from Lake to 36th Street Columbus Avenue South from Lake to 36th Street East 36th Street from Oakland to Chicago |
2. South Uptown Neighborhood | Bryant Ave S from 35th St W to Lake Street Colfax Ave S from 35th St W to Lake Street 35th Street West from Bryant Ave S to Colfax Ave South |
3. Linden Hills Neighborhood | Zenith Ave S from 38th St W to 36th St West Abbott Ave S from 38th St W to 36th St West 36th St W from Zenith Ave S to Abbott Ave South |
4. Willard-Hay Neighborhood | Morgan Ave N from Plymouth to Golden Valley Road Newton Ave N from Plymouth to Golden Valley Road Oliver Ave N from Plymouth to Golden Valley Road |
5. Grand Avenue | Grand Ave S from 42nd St W to 48th St West |
Cleaning and Structural Lining | |
6. Penn Avenue North | Penn Ave N/S from Chestnut Ave to 2nd Ave N |
Project area maps
Central Neighborhood
South Uptown Neighborhood
Linden Hills Neighborhood
Willard-Hay Neighborhood
Grand Avenue
Penn Avenue North
2019 Water Main Cleaning and Lining
Construction Dates
- 17th Ave S: July 2019
- 12th Ave S: July 2019
- Lincoln St NE: July 2019
- 2nd Ave S: July 2019
- McKinley Neighborhood: July 2019
- Carag Neighborhood: August 2019
- Linden Hills Neighborhood: August 2019
- Quincy St NE: August 2019
Project Limits
Cleaning and Structural Lining |
1 - 17th Ave S | 17th Ave S, from 48th St E to 49th St E |
2 - 12th Ave S | 12th Ave S, from 31st St E to Lake St |
3 - Lincoln St NE | Lincoln St NE, from 36th Ave NE to 37th Ave NE |
4 - 2nd Ave S | 2nd Ave S, from 40th St E to 42nd St E |
Cleaning and Mortar Lining
| |
5 – McKinley Neighborhood | 3rd St N from Lowry Ave to 34th Ave N and 35th to 36th Ave N 4th St N from Lowry Ave to Dowling Ave 6th St N from Lowry Ave to Dowling Ave 33rd Ave N from 4th St N to Lyndale Ave 34th Ave N from 6th St N to Lyndale Ave 36th Ave N from 4th St N to 6th St N |
6 – Carag Neighborhood | Bryant Ave S from 35th St W to Lake St Colfax Ave S from 35th St W to Lake St 35th St W from Bryant Ave S to Colfax Ave S |
7 – Linden Hills Neighborhood | Zenith Ave S from 38th St W to 36th St W Abbott Ave S from 38th St W to 36th St W 36th St W from Zenith Ave S to Abbott Ave S |
8 – Quincy St NE | Quincy St NE from Broadway St NE to 15th Ave NE 15th Ave NE from Quincy St NE to Monroe St NE |
2018 Water Main Cleaning and Lining
Construction Dates
- Waite Park May 2018
- 8th Street South June 2018
- Fulton South April 2018
- Hoyer Heights May 2018
- 6th Street South August 2018
- Hollywood Ave NE August 2018
- Randolph St NE August 2018
Project Limits
Cleaning and Mortar Lining |
1 - Waite Park | 34th Ave NE from Ulysses St NE to Garfield St NE 36th Ave NE from Johnson St NE to Cleveland St NE Hayes St NE from 34th Ave NE to 36th Ave NE Wilshire Place from 34th Ave NE to 36th Ave NE |
2 - 8th Street South | From Hennepin Avenue to Chicago Avenue |
3 - Fulton South | W 46th Street to W 54th Street York Ave S to France Ave S |
4 - Hoyer Heights | 36 ½ Ave NE from 37th Ave NE to Buchanan St NE Taylor St NE from 36 ½ to 37th Ave NE Pierce St NE from 36 ½ to 37th Ave NE Pierce Pl from 36 ½ to 37th Ave NE Buchanan St NE from 36 ½ to 37th Ave NE |
Cleaning and Structural Lining
| |
5 – 6th Street South | From 20th Ave S to 21st Ave S |
6 – Hollywood Ave NE | From Johnson St NE to Cleveland St NE |
7 – Randolph St NE | From 26th Ave NE to 31st Ave NE |
Project Documents
Water Main Cleaning and Lining Overview Map
6th Street South Map
8th Street South Map
Fulton South Area Map
Hollywood Avenue Northeast Map
Hoyer Heights Area Map
Randolph Street Northeast Map
Waite Park Area Map
Project Contacts
Nate Wold, General Foreman; 612-673-5600 or [email protected]