4th Street North & South Reconstruction

The City of Minneapolis will be reconstructing 0.6 miles of 4th St between 2nd Ave N and 4th Ave S. The design for the 4th St Reconstruction Project is complete and road reconstruction is anticipated to begin in Spring of 2021.

4th St N S

Virtual neighborhood meeting

City staff will be holding a virtual neighborhood meeting to give an update and answer questions about the 4th St N and S project on Tuesday, October 27.

Virtual Pre-Assessment Meeting
Tuesday, October 27, 2020
4:00-5:00 p.m.
via Microsoft Teams

How to join

A link to the virtual meeting will be added here before the meeting date.

Project status

Project Status: Design

Background

The project will include reconstruction from building front to building front with full removal of the existing street, curb and gutter, driveways, and sidewalk. The design for the reconstructed 4th Street includes new roadway pavement, better pedestrian crossings, and a new protected bike facility. View the final 4th St S roadway layout.

Goals

The goals of the project are to:

Before (Photo)

4th St looking east between Marquette Ave and 2nd Ave

4th St S Before Photo

After (Rendering)

4th St looking east between Marquette Ave and 2nd Ave

4th St S After Rendering

Schedule

Utility Repairs Underway

Metropolitan Council Environmental Services (MCES) is currently underway with construction of two new access shafts on 4th Street, just east of Hennepin and Marquette Avenues, to repair the underground tunnels. Repair work will include stabilizing the walls of the tunnel, removing debris from the top of the pipe, rehabilitating the pipe, then filling the space with grout. This work is anticipated to be complete by Spring 2020.

Check out the MCES 4th St Tunnel project for more information on the tunnel repair work:

http://www.metrocouncil.org/sewerconstruction/4thStreetTunnel

Project Date Postponed

In order to best coordinate with several other active downtown street projects, the 4th Street Reconstruction Project has been postponed one year and is now anticipated to begin in Spring 2021 instead of Spring 2020. Additional utility work is currently scheduled to begin in Spring 2020. 

4th St S Schedule

Documents

4th St S Final Design

Past meetings

Stakeholder Meeting

February 19, 2019, 3-5pm
Minneapolis Central Library, Doty Room
300 Nicollet Mall
Minneapolis, MN

Stakeholder Meeting Presentation
Stakeholder Meeting Boards

Individual Property Meetings

November 2018-December 2018

Meeting Agenda
Layout

Open House #2

October 18, 2017, 4:30-6pm
Minneapolis Central Library, Doty Room
300 Nicollet Mall, Minneapolis, MN 55401

4th St S Layout(10/19/2017)
Open House #2 Presentation (10/18/2017)

Open House #1

February 13, 2017, 4-6pm
Minneapolis Central Library, Doty Room
300 Nicollet Mall, Minneapolis, MN

2017 Assessment Info Packet (updated 1/25/17)*
Project Fact Sheet (updated 2/317)
Open House #1 Materials (updated 2/1517)
Open House #1 Existing Conditions Map (updated 2/1717)

*This packet provides general information about uniform assessment rates and how the City of Minneapolis calculates influence areas for projects like Hennepin Avenue. Public Works will not have project assessment information about individual parcels until late 2018 or early 2019.

Sign up for email updates

Email Updates
To sign up for updates or to access your subscriber preferences, please enter your contact information below.

Updates

October 16, 2020 Update

September 25, 2020 Update

September 11, 2020 Update

July 2020 Update

January 2019 Update

April 13, 2017 Update

Final City Council Layout Approval

March 3, 2017 Update

A project survey is now available to collect additional public input. Please share your ideas by taking this survey.

February 15, 2017 Update

The materials presented at the February 13, 2017 open house have been posted in the Project Documents section.

February 3, 2017 Update

The project team has been meeting with property owners and other key stakeholders over the past month, and is hosting a public Open House on February 13, 2017 between 4:00-6:00 p.m. at the Minneapolis Central Library, 300 Nicollet Mall, Doty Board Room. There will be a short presentation at 4:30 p.m.

January 6, 2017 Update

The project was presented to the Bicycle Advisory Committee Engineering Subcommittee on Tuesday, December 13, 2017 between 4:00-6:00 p.m. at the Colonial Warehouse Building, 212 3rd Avenue North, Suite 404 and the Pedestrian Advisory Committee, Infrastructure & Engineering Subcommittee on Thursday, December 15, 2017 between 4:30-6:00 p.m. at Minneapolis City Hall, 350 5th Street South, Room 212.

Contact

Bill Fellows, Project Engineer, 612-673-5661 or [email protected]

Project email: [email protected]

Project Hotline: 612-404-1830

Last updated Oct 16, 2020

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-263-6850.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

Public Works  ©1997-2020 City of Minneapolis, MN

CONNECT

311 call center

311 TTY relay service

City of Minneapolis Facebook City of Minneapolis Twitter City of Minneapolis YouTube ChaNNEL Minneapolis 311 Watch Minneapolis City Council TV City of Minneapolis LinkedIn

Minneapolis, City of Lakes logo