Como Stormwater Tunnel Improvements
Improvements will be made to a stormwater tunnel involving six 110 ft. deep drill holes along Como Ave SE between 19th Ave SE and 24th Ave SE.
Project Status
Project Description
The Como Drainage Tunnel System has produced geysers 30-35 feet high through drill holes along Como Ave due to rapid pressurization of the tunnel during large rain events. These geysers potentially undermine the safety of pedestrians and vehicles in the area. This project seeks to increase the size of these drill holes to help safely diffuse pressure in the tunnel.
Project Limits
The work will be confined to the intersections of Como Ave and 19th Ave, 20th Ave, 21st Ave, 22nd Ave, 23rd Ave, and 24th Ave.
Traffic Impact
There will be a traffic control plan in place to help minimize the impact of construction in the area. Partial closure of each of the intersections will occur during the project. Traffic traveling North will be impeded at each intersection.
Photos
High pressure during a heavy rainstorm produced this storm sewer geyser along Summit Ave in St. Paul, MN in May 2017.
Source: Matthew Brenengen https://www.youtube.com/watch?v=8T4_siXsZIQ
Contact
William T. Shutte, Senior Professional Engineer; 612-673-3606 or [email protected]
Last updated May 8, 2020