46th Ave S Reconstruction

Project Status

Project Details
Project Description:
The City of Minneapolis proposes to reconstruct 46th Avenue South between Godfrey Parkway and 46th Street East. The existing street is in poor condition, with heavy asphalt patching and deteriorated curb. This one block project is scheduled to occur within the 2017 construction season and will consist of improvements to the roadway, sidewalk and boulevard space. City staff held two meetings with the Longfellow Neighborhood Association in early 2016, and attended both the Pedestrian and Bicycle Advisory Committees in late 2015. Feedback from these meetings helped inform the preliminary project layout shown below. City staff expect to bring this preliminary layout to City Council in April for approval. More detailed design is expected to take place later in 2016 and into 2017.
Project Location:
The portion of 46th Avenue South to be reconstructed is between Godfrey Parkway and 46th Street East. The southern half of this segment lies within Minnehaha Park.
Construction Dates:
August 14 through September 22, 2017
Traffic Impact:
46th Avenue South between Godfrey Parkway and 46th Street East will be closed during construction.
Public Meetings:
June 6, 2017: Public Hearing, Council Chambers, City Hall
April 18, 2017: Project Designation, Council Chambers, City Hall
January 26, 2016 and March 8, 2016: Neighborhood engagement held during Longfellow Community Council's regularly scheduled meetings
October 20, 2015: Project introduced at the Longfellow Community Council meeting
September 17, 2015: Minneapolis Pedestrian Advisory Committee
September 15, 2015: Minneapolis Bicycle Advisory Committee
Project Layout:
For questions or comments about the project please contact:
Elisha Langat, Construction Engineer, 612-673-5974
Adam Hayow, Project Engineer, 612-673-2172
(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.
Last updated Apr 25, 2019